DOVICO Planning & Timesheet
DOVICO Planning & Timesheet v3.6 - March 2012
DOVICO Planning & Timesheet V3 Service Pack 6 |
- DOVICO Planning & Timesheet versions 3.0 through 3.5
IMPORTANT: This service pack is designed specifically for the DOVICO Planning & Timesheet versions noted above and should not be installed on any other version.
Verify your existing version by clicking on the About button on DOVICO Planning & Timesheet's toolbar.
Applying Service Pack 6:
- Download Service Pack
- Backup all databases.
- Make sure no one is using any DOVICO Planning & Timesheet component.
- Stop the DOVICO Job Scheduler service (Start, Control Panel, Administrative Tools, Services).
- Run the downloaded service pack file on the server where DOVICO Planning & Timesheet is located. The install will automatically detect and upgrade your existing installation.
- Restart the DOVICO Job Scheduler service (if the Server was not rebooted during the upgrade).
- When logging back into the software, you will be prompted to upgrade the database.
- After the upgrade, verify that the version number is 3.6 (displayed at the bottom of the Login screen or using the About button from within the application).
NEW |
New Report Export format |
The current CSV report export option is not a true CSV file. In service pack 6, exporting to CSV will work as it should. The old CSV format remains available and is renamed ‘Unformatted Excel’. Note that any scheduled jobs created in the previous versions of the software using the old CSV format are not effected. |
Corrections |
Currencies |
Fixed a currency conversion issue when a new exchange rate period is created and the ‘Get Exchange Rates’ function is not used to populate the exchange rates. Under these specific circumstances (manually entering exchange rates for a new rate period), the one to one conversions were not being saved. For example, the conversion rate from USD to USD should be ‘1’, but was not being saved to the database. This resulted in a $0.00 value being returned whenever a conversion from USD to USD was performed in that exchange rate period. It is also important to note that this problem does not occur when Currencies are first enabled; this can occur only when a new exchange rate period is created. |
Features and Corrections from Service Pack 1, 2, 3 and 5 are included in Service Pack 6. There is no Service Pack 4.
|
|
NEW |
Hosted Service API |
For all Hosted customers: The DOVICO Hosted API allows customers and third party developers to expand and build on the DOVICO Hosted platform. Learn more > |
Alert Center |
For managers and administrators, a red icon is placed at the far right side of the toolbar whenever he or she has time or expenses to approve. This new ‘Alert Center’ also notifies administrative users when they have rejected time or expenses. |
Time Entry grid |
Expand or collapse a project's task assignments in the time entry grid by clicking the +/- graphic at the beginning of the Client-Project name.
Navigate within the time entry grid using the Up/Down arrow keys on your keyboard. Use Tab and Shift+Tab to move side to side. |
Billing View |
The sort order of invoices in the Billing view has been changed. Now the Billing view shows the most recently added Invoice at the top of the list. |
Database Options |
Locked Users settings are now located in Database Options, and will be reset to default values after the upgrade (users locked out for 30 minutes after 5 invalid logins within a 30 minute span). |
Better Messaging |
Stronger warning messages before deleting projects, tasks and employees. |
Calendar pop-up control |
Improved calendar pop-up controls to navigate from month to month. |
Currencies |
Currency exchange rates are displayed to 5 decimal places (an increase from 4 decimal places).
This change only takes effect the next time you retrieve exchange rates from OANDA. Note that for the vast majority of exchange rates, OANDA supplies only 4 decimal places. |
Corrections |
Time Zone |
Corrected a time entry grid issue reported by users in the GMT -3 timezone where Daylight Savings is observed (Central and Eastern Brazil) |
Archive |
The Archive function has been removed while we correct an issue reported by a client. The Archive function will return in a future Service Pack (Spring 2012). |
Resource Utilization |
Corrected a problem where large project structures could cause the Resource Utilization view to crash |
|
Corrections |
Next Item function |
Recent changes in Chrome and Safari browser have broken the Previous/Next item functions located at the bottom of certain forms (e.g. Employee properties). When using the Previous/Next function to move from one record to another, values in certain drop-down lists would be carried over from one record to another. |
Multi-Currency |
When a currency is removed from the list of enabled currencies, the software checks to ensure that the currency to remove is not used anywhere in the software. The currency for the Fixed Amount column in Expenses was not being checked. |
|
Corrections |
Multi-Currency |
Overlapping exchange rate periods could occur when creating multiple new Historical exchange rate periods and then editing the period dates (very rare). |
Time and Expense Approvals |
With Currencies enabled, the Time & Expense Approval view was not properly converting the calculated totals in some circumstances. |
Time Calendar |
Overtime hours were not displayed in red in the Time Calendar view. |
Approval Workflows |
When editing approval workflow templates, the user was not prompted to update existing workflows. |
Billing |
With Currencies enabled, the Billing view would not always display a project's costs in the project's defined currency. |
Project Planning |
Project Planning was not properly removing deleted assignments when the project was originally created in the old Project Workspace. This same bug could also cause global tasks to be deleted. |
Hosted Login Improvements |
Login from any DOVICO website |
Hosted Clients only: The login page has been modified so that a user can now log in to his or her database from any of DOVICO's websites. |
|
Corrections |
Upgrade from older version |
Resolved an upgrade issue for clients that have a database with case sensitive collation. |
Project Planning |
Resolved leveling issue. |
Project Planning |
Corrected validation error with when a future date is set in a project's Budget Exchange Rate field. |
Reporting |
Project Fixed Cost (with Budget) report showing incorrect values for cost information (all values are doubled) when Currencies is enabled.
Client Time and Costs by Project report showed the same value for Client Cost and Company Cost totals/
Resolved problem where column headers are not displayed when exporting reports as an Excel file.
With Multi-Currency disabled, fixed-cost expenses would not appear is certain expense reports. |
Task Properties |
Resolved missing “More” button in the Task Properties view. |
Reporting |
Corrected possible rounding issues found in reports showing Estimated Hours. |
Approval Workspace |
Corrected problem with Actual Hours column displaying Estimated Hours values. |
Regional Settings |
Certain regional settings, such as Canada (French), would cause a string formatting error when using the Actuals Wizard. |
New features |
Web browsers |
Added browser support for Safari 5 and Chrome 11
*When using the software on a MAC operating system, there are some functional limitations. The Offline Time Entry function, the QuickBooks Link, the Import/Export tool and the Microsoft Project Link will not work. |
Attach Receipts |
Enforced client-side file size validation though via HTML 5, Flash, and Silverlight. The end user will require support for one of these technologies in order to use the Attach Receipt functionality. |
|
DOVICO Timesheet
DOVICO Timesheet v11.6 - March 2012
DOVICO Timesheet V11 Service Pack 6 |
- DOVICO Timesheet versions 11.0 through 11.5
IMPORTANT: This service pack is designed specifically for the DOVICO Timesheet versions noted above and should not be installed on any other version.
Verify your existing version by clicking on the About button on DOVICO Timesheet's toolbar.
Applying Service Pack 6:
- Download Service Pack.
- Backup all databases.
- Make sure no one is using any DOVICO Timesheet component.
- Stop the DOVICO Job Scheduler service (Start, Control Panel, Administrative Tools, Services).
- Run the downloaded service pack file on the server where DOVICO Timesheet is located. The install will automatically detect and upgrade your existing installation.
- Restart the DOVICO Job Scheduler service (if the Server was not rebooted during the upgrade).
- When logging back into the software, you will be prompted to upgrade the database.
- After the upgrade, verify that the version number is 11.6 (displayed at the bottom of the Login screen or using the About button from within the application).
NEW |
New Report Export format |
The current CSV report export option is not a true CSV file. In service pack 6, exporting to CSV will work as it should. The old CSV format remains available and is renamed ‘Unformatted Excel’. Note that any scheduled jobs created in the previous versions of the software using the old CSV format are not effected. |
Corrections |
Currencies |
Fixed a currency conversion issue when a new exchange rate period is created and the ‘Get Exchange Rates’ function is not used to populate the exchange rates. Under these specific circumstances (manually entering exchange rates for a new rate period), the one to one conversions were not being saved. For example, the conversion rate from USD to USD should be ‘1’, but was not being saved to the database. This resulted in a $0.00 value being returned whenever a conversion from USD to USD was performed in that exchange rate period. It is also important to note that this problem does not occur when Currencies are first enabled; this can occur only when a new exchange rate period is created. |
Features and Corrections from Service Pack 1, 2, 3 and 5 are included in Service Pack 6. There is no Service Pack 4. |
|
Improvements |
Hosted Service API |
For all Hosted customers: The DOVICO Hosted API allows customers and third party developers to expand and build on the DOVICO Hosted platform. Learn more > |
Alert Center |
For managers and administrators, a red icon is placed at the far right side of the toolbar whenever he or she has time or expenses to approve. This new ‘Alert Center’ also notifies administrative users when they have rejected time or expenses. |
Time Entry grid |
Expand or collapse a project's task assignments in the time entry grid by clicking the +/- graphic at the beginning of the Client-Project name.
Navigate within the time entry grid using the Up/Down arrow keys on your keyboard. Use Tab and Shift+Tab to move side to side. |
Billing View |
The sort order of invoices in the Billing view has been changed. Now the Billing view shows the most recently added Invoice at the top of the list. |
Database Options |
Locked Users settings are now located in Database Options, and will be reset to default values after the upgrade (users locked out for 30 minutes after 5 invalid logins within a 30 minute span). |
Better Messaging |
Stronger warning messages before deleting projects, tasks and employees. |
Calendar pop-up control |
Improved calendar pop-up controls to navigate from month to month. |
Currencies |
Currency exchange rates are displayed to 5 decimal places (an increase from 4 decimal places).
This change only takes effect the next time you retrieve exchange rates from OANDA. Note that for the vast majority of exchange rates, OANDA supplies only 4 decimal places. |
Corrections |
Time Zone |
Corrected a time entry grid issue reported by users in the GMT -3 timezone where Daylight Savings is observed (Central and Eastern Brazil) |
Archive |
The Archive function has been removed while we correct an issue reported by a client. The Archive function will return in a future Service Pack (Spring 2012). |
|
Corrections |
Next Item function |
Recent changes in Chrome and Safari browser have broken the Previous/Next item functions located at the bottom of certain forms (e.g. Employee properties). When using the Previous/Next function to move from one record to another, values in certain drop-down lists would be carried over from one record to another. |
Multi-Currency |
When a currency is removed from the list of enabled currencies, the software checks to ensure that the currency to remove is not used anywhere in the software. The currency for the Fixed Amount column in Expenses was not being checked. |
|
Corrections |
Multi-Currency |
Overlapping exchange rate periods could occur when creating multiple new Historical exchange rate periods and then editing the period dates (very rare). |
Time and Expense Approvals |
With Currencies enabled, the Time & Expense Approval view was not properly converting the calculated totals in some circumstances. |
Time Calendar |
Overtime hours were not displayed in red in the Time Calendar view. |
Approval Workflows |
When editing approval workflow templates, the user was not prompted to update existing workflows. |
Billing |
With Currencies enabled, the Billing view would not always display a project's costs in the project's defined currency. |
Hosted Login Improvements |
Login from any DOVICO website |
Hosted Clients only: The login page has been modified so that a user can now log in to his or her database from any of DOVICO's websites. |
|
Corrections |
Upgrade from older version |
Resolved an upgrade issue for clients that have a database with case sensitive collation. |
Reporting |
Project Fixed Cost (with Budget) report showing incorrect values for costs (all values are doubled) when Currencies is enabled.
Client Time and Costs by Project report showed the same value for Client Cost and Company Cost totals.
Resolved problem where column headers are not displayed when exporting reports as an Excel file.
With Multi-Currency disabled, fixed-cost expenses would not appear is certain expense reports. |
Task Properties |
Resolved missing “More” button in the Task Properties view. |
Reporting |
Corrected possible rounding issues found in reports showing Estimated Hours. |
Approval Workspace |
Corrected problem with Actual Hours column displaying Estimated Hours values. |
Regional Settings |
Certain regional settings, such as Canada (French), would cause a string formatting error when using the Actuals Wizard. |
New features |
Web browsers |
Added browser support for Safari 5 and Chrome 11
*When using the software on a MAC operating system, there are some functional limitations. The Offline Time Entry function, the QuickBooks Link, the Import/Export tool and the Microsoft Project Link will not work. |
Attach Receipts |
Enforced client-side file size validation though via HTML 5, Flash, and Silverlight. The end user will require support for one of these technologies in order to use the Attach Receipt functionality. |
Improvements |
Employee Properties |
The Working Days field (MTWTF) is no longer displayed in the Employee properties window. |
|
DOVICO Timesheet v10.2 - March 2010
DOVICO Timesheet V10 Service Pack 2 |
The information in this article applies to:
-
DOVICO Timesheet versions 10.0 through 10.1
IMPORTANT:This service pack is designed specifically for the DOVICO Timesheet versions noted above and should not be installed on any other version of DOVICO Timesheet or any version of Track-IT Suite.
Verify your existing version by clicking on the About button on DOVICO Timesheet's toolbar.
Applying Service Pack 2 for DOVICO Timesheet version 10.x:
- Download Service Pack 2 from the following location.
http://www.dovico.com/software/DovicoTimesheetV10SP2.exe
- Backup all databases.
- Make sure no one is using any DOVICO Timesheet component.
- Stop the DOVICO Job Scheduler service (Start, Control Panel, Administrative Tools, Services).
- Run the downloaded file on the server where DOVICO Timesheet is located. The install will automatically detect and upgrade your existing installation.
- After the upgrade, verify that the version number is 10.2 (displayed at the bottom of the Login screen or using the About button from within the application).
- Restart the DOVICO Job Scheduler service (if the Server was not rebooted during the upgrade).
Congratulations!!! You have successfully applied Service Pack 2.
Fixes |
Reporting |
Corrected performance and data issues related to Billable/Non-Billable Time with Budget reports. |
Reporting |
Corrected formatting problem in the Employee Expenses with Company costs report. |
Miscellaneous |
Corrected timing error in Project Workspace resulting in "Object does not support this method" error. |
Archive |
Fixed archive function when attempting to archive two clients that had projects with the same name. |
Miscellaneous |
Corrected issue with "Replace Last Value Only" option when updating Employee rates. |
Login |
Updated URL on login page for 64bit OS. |
Microsoft Project Link |
Corrected upgrade problem moving from version 9 to 10. |
Job Scheduler |
Corrected a rounding error in the Employee Incomplete Timesheet e-mail notification |
|
|
New Features |
Time Lockout |
Added an employee buffer duration for time entry users |
Time Lockout |
Added 'time waiting to be approved' to the existing View Details report. |
Login security |
Added user lockout after 5 failed login attempts. (does not apply to hosted clients) |
Hosted Login page |
Added 'Forgot password' feature. |
Improvements |
SQL Express password |
Removed the default SQL password when installing SQL Express. |
QuickBooks and Import/Export security |
Improved data security when connecting to database. |
Offline Timesheet |
Improved data security when connecting to database. |
Microsoft Project Server |
Improved password security when connecting to database. |
Active Directory |
Improved password security when connecting to database. |
Database Options |
Improved security for SMTP password |
List of corrections |
Expenses |
Added scroll bar to left pane in Approved Expenses view. |
Expenses |
Corrected issue in Approved Expenses view when reimbursing an expense sheet. |
Expenses |
Fixed issue when changes are made to an expense sheet name. |
Expenses |
Corrected possible conflict in Expense Category data across databases. |
Expenses |
Fixed glitch with expense sheet name length when upgrading unsubmitted sheets from previous versions. |
Time Lockout |
Corrected validation when attempting to submit time in a locked out period. |
Time Entry |
Corrected problem with time entry grid assignments being improperly disabled after deleting a project. |
Approvals |
Fixed issue with Approval Workspace view occasionally not loading properly. |
QuickBooks and Import/Export |
Corrected issue for Active Directory users when launching the QuickBooks Link or the Import/Export tool. |
Archive |
Fixed problem with Archive function resetting the Software Access field for time entry users. |
Archive |
Corrected occasional memory errors when archiving a very large database. |
Upgrade |
Corrected upgrade code for conditions when limited access was applied to employees/teams in previous versions. |
Miscellaneous |
Fixed calendar icon issue in multiple views. |
Miscellaneous |
Corrected Internet Explorer 6 lock up issue. |
Miscellaneous |
Improved structure of some SQL statements |
Miscellaneous |
Modifications to prevent false 'thread aborted' event appearing in event log for BrowseResourceRequest method. |
Miscellaneous |
Corrected problem with calendar in time entry view not always displaying the correct 'first day of the week'. |
Miscellaneous |
Fixed problem in the Bulk Time Move view where the Destination Task list was not always properly updated. |
|
DOVICO Timesheet v9.2
DV1170 DOVICO Timesheet V9 Service Pack 2 |
Applies to:
- DOVICO Timesheet versions 9.0 and 9.0.1 and 9.1
IMPORTANT: This service pack is designed specifically for the DOVICO Timesheet versions noted above and should not be installed on any other version of DOVICO Timesheet or any version of Track-IT Suite.
Verify your existing version by clicking on the About button on DOVICO Timesheet's toolbar.
Applying Service Pack 2 for DOVICO Timesheet version 9.x:
- Download Service Pack 2 from the following location. http://www.dovico.com/software/DovicoTimesheetV9SP2.exe
- Backup all databases.
- Make sure no one is using any DOVICO Timesheet component.
- Stop the DOVICO Job Scheduler service (Start, Control Panel, Administrative Tools, Services).
- Run the downloaded file on the server where DOVICO Timesheet is located. The install will automatically detect and upgrade your existing installation.
- After the upgrade, verify that the version number is 9.2 (displayed at the bottom of the Login screen or using the About button from within the application).
- Restart the DOVICO Job Scheduler service (if the Server was not rebooted during the upgrade).
Congratulations!!! You have successfully applied Service Pack 2.
| List of correction in DOVICO Timesheet Service Pack 2 |
Job Scheduler |
Corrected formatting problems when sending e-mails containing large amounts of data. |
Job Scheduler |
Corrected problem with sending duplicate e-mail notifications. |
Job Scheduler |
Corrected problem with date offset when scheduling a reporting job using custom dates. |
Database Manager |
Corrected occasional connection failures to remote SQL server when creating or archiving a database. |
Database Manager |
Corrected issue when creating a new database with the same name as an existing database. |
Database Manager |
Corrected timeout issues when an archive function is forced to roll back. |
Installation |
Increased the complexity of default password for SQL account. |
Microsoft Project |
Corrected erroneous error message when synchronizing resources with Microsoft Project Server. |
Microsoft Project |
Corrected status date parsing issue with non-US English regional settings.
|
Database Schema |
Corrected missing column in DOVICO_VIEW_APPROVED_TIME_WITH_CUSTOM. |
Custom Fields |
Amended reporting logic between custom fields from AND to OR. |
|
DOVICO Timesheet v8.1
DOVICO Timesheet V8 Service Pack 1 |
The information in this article applies to:
- DOVICO Timesheet version 8.0 only
IMPORTANT: This service pack is designed specifically for DOVICO Timesheet version 8.0 and should not be installed on any other version of DOVICO Timesheet or any version of Track-IT Suite.
Verify your existing version by clicking on the About button on DOVICO Timesheet's toolbar.
Applying Service Pack 1 for DOVICO Timesheet version 8.0:
- Download Service Pack 1 from the following location. http://www.dovico.com/software/DOVICOTimesheetV8SP1.exe
- Backup all databases.
- Make sure no one is using any DOVICO Timesheet component.
- Stop the Job Scheduler service.
- Run the downloaded file on the server where DOVICO Timesheet 8.0 is located. The install will automatically detect and upgrade your existing installation.
- Upgrade each database by selecting the database from the Login page's database drop-down list. The database upgrade occurs automatically.
- After the upgrade, verify that the version number is 8.1 (displayed at the bottom of the Login screen or using the About button from within the application).
- Restart the Job Scheduler service (if the Server was not rebooted during the upgrade).
Congratulations!!! You have successfully applied Service Pack 1 for DOVICO Timesheet
List of Fixes in DOVICO Timesheet Service Pack 1
- Invoices - Invoices can now be exported
- https - Improved launching of views, tools and Reports Explorer functionality when using https
- Approval View - Corrected Totals when using projects linked to Microsoft Project
- Time Entry Descriptions - Improved reporting of time entry descriptions greater than 255 characters in length
- Microsoft Project Server - Fixed issue with Group and E-mail fields in Resource pool
- Active Directory - Fixed issue when trying to return more than 1000 records
- Calendar View - Fixed issue with Project list not being sorted correctly when Client abbreviations are off
- Login - User ID no longer case sensitive on login
- Offline Time Entry - New
- Microsoft Project - Fixed issue with Get Assignments synchronization
- Custom Fields - Fixed issue with Single/Multiple choice showing improper historical value if value is edited
|
|